COURSE OVERVIEW

Creating Calendar
• Creating a new Calendar
• Editing the calendar
• editing or defining the standards of the calendar

Creating a Project
• Create a project
• Navigate in the Projects window
• View and modify information in Project Details

Creating a Work Breakdown Structure
• Define a Work Breakdown Structure
• Create multiple levels of a WBS hierarchy

Adding Activities
• Describe an activity and its components
• Describe activity types
• Add activities
• Add a Notebook topic to an activity
• Add steps to an activity
• Assign activity codes to activities
• giving the feedback for activities

Creating Relationships
• View a network logic diagram
• Differentiate between the four relationship types
• Create relationships in the Activity Network
• Create relationships in Activity Details

Scheduling
• Perform a forward and backward pass
• Describe float and its impact on a schedule
• Identify loops and open ends
• Calculate a schedule
• Analyze the scheduling log report

Assigning Constraints
• Apply an overall deadline to a project
• Apply a constraint to an individual activity
• Add notebook topics to constrained activities
• Describe the available constraint types

Formatting Schedule Data
• Group activities according to specific criteria
• Sort activities
• Apply a filter
• Create a filter

Roles and Resources
• Describe roles
• Views the roles dictionary
• Describe resources
• Identify the differences between labor, non labor and material resources
• View the resource dictionary

Assigning Roles
• Assign roles to an activity
• Assign rates on roles

Assigning Resources and Costs
• Assign resources by role
• Assign labor, non labor, and material resources to activities
• Adjust Budgeted Units/Time for a resource
• Assign expenses to activities
• adjusting the Budgeted Units for resources

Analyzing Resources
• Display the Resource Usage Profile
• Format a profile
• Format the timescale

Analyzing Resources by curves
• Using the default curse for resources
• creating/editing a new curve
• analyzing how to use resources using curve

Optimizing the Project Plan
• Analyze schedule dates
• Shorten a project schedule
• Analyze resource availability
• Remove resource over-allocation
• Analyze project costs

Base lining the Project Plan
• Create a baseline plan
• Assigning baseline plan
• Display baseline bars on the Gantt Chart
• Modify the bars on the Gantt Chart

Project Execution and Control
• Describe several methods for updating the project schedule
• Use Progress Spotlight
• Status activities
• Reschedule the project

Reporting Performance
• Describe reporting methods
• Run a schedule report
• Create a resource report with the Report wizard
• Create a report using the current layout

COURSE FEES & TRAINING METHODOLOGY

Training Methodology-1: (At ECC Premises)

Note: ECC is closed because of the Pandemic in March 2020 and will remain closed till the Pandemic completely ends. So, the students are advised to prefer online training only.

a) The student is supposed to listen the day’s prescribed syllabus through our e-learning video lectures.
b) Then he is supposed to practice the same in the computer lab, with the help of e-tutors.
c) The lectures are made in such a way that the student will be able to do without any staff help.
d) Still, if the students gets any doubt, then the staff will assist him.

Course Fees: Rs.12000/-

Training Methodology-2: (Completely online)

a) The student is supposed to listen the day’s prescribed syllabus through our e-learning video lectures.
b) Then he is supposed to practice the same in the computer lab, with the help of e-tutors.
c) Software installation help will be given by our Systems support Engineer.
d) The lectures are made in such a way that the student will be able to do without any staff help.
e) Still, if the students gets any doubt, they are required to make a note of the same and email us in the doubts section in our online portal www.eccindia.org
f) Our instructors will answer your queries within 24 hours (or) will come online through skype and shall answer all the queries from all the students.

Course Fees: Rs.3600/-

CONTACT INFORMATION

Contact Ms. Faheem on 98661-31068 between 11am-6pm for any queries (or) Email us at services@eccindia.org and mark a copy to training@eccindia.org

For any Queries on online training, please contact Ms. Naima between 9am-6pm on 97033-31068.

Trainer:
Md. Sadiq
B.Tech (Civil), MBA
Director
ENGINEERS CADD CENTRE PVT LTD™

Brief Profile: Has over 21 years of Experience in Civil Engineering Projects in India and middle east. One of the best Trainers for Primavera and Ms Project Training in India. Ecc started training Primavera software since 1994. Trained over 250 Batches in Primavera & Msp not only to students but also to leading consulting engineers and project managers.

Email: services@eccindia.org

Cell: 9703331068 (10am-1pm)